Smart Pump Multizone Installation & Start Up Manual Commercial Flow Center Series ALL THE PUMP YOU NEED AND MORE 866-646-6724 712-652-3424 ww
10 ALL THE PUMP YOU NEED AND MORE Revised 7-5-12 Drive Display/Operation Navigating and Changing Drive Parameters – The start screen on the LED will
11 ALL THE PUMP YOU NEED AND MORE Revised 7-5-12 System Start Up Procedure Fill canister water level to dip tube elbow. **Valve and flange adapter no
12 ALL THE PUMP YOU NEED AND MORE Revised 7-5-12 Fill and Start Procedure Fill and Start Procedure: Smart Pump – NOTE: The Smart Pump Multizone is n
13 ALL THE PUMP YOU NEED AND MORE Revised 7-5-12 Fill and Start Procedure Heat Pump Balancing Procedure: How to set drive pressure setting – 1. Aft
14 ALL THE PUMP YOU NEED AND MORE Revised 7-5-12 System Start Up Procedure Adjusting Sleep Function – Parameter B5-15 in Set Up Menu “STUP” Perform
15 ALL THE PUMP YOU NEED AND MORE Revised 7-5-12 SYSTEM CHECKS System Checks – 1. Once the system settings have been adjusted and the V1000 adjust
16 ALL THE PUMP YOU NEED AND MORE Revised 7-5-12 Troubleshooting- Faults Faults Description Suggestion(s) oL1/oL2 Motor/Drive Overload Leave power
17 ALL THE PUMP YOU NEED AND MORE Revised 7-5-12 Troubleshooting- Stop Function The “STOP Function” for the Yaskawa V1000 Drive is Based on Two Condi
18 ALL THE PUMP YOU NEED AND MORE Revised 7-5-12 Motor Testing Evaluation – If all ohm values are normal, the motor windings are neither shorted nor
19 ALL THE PUMP YOU NEED AND MORE Revised 7-5-12 Notes
2 ALL THE PUMP YOU NEED AND MORE Revised 7-5-12 Product Data H D P System Introduction – For applications that require a little more than it’s Multi
3 ALL THE PUMP YOU NEED AND MORE Revised 7-5-12 Performance Curve – Pump Information – Product Data Pump Model Nominal Fl
4 ALL THE PUMP YOU NEED AND MORE Revised 7-5-12 Installation Guidelines & Procedures for B & D MFG., INC. Smart Pump Multizone Flow Center
5 ALL THE PUMP YOU NEED AND MORE Revised 7-5-12 Installation WARNING: It can be extremely dangerous to touch the electrical parts, even when the main
6 ALL THE PUMP YOU NEED AND MORE Revised 7-5-12 Installation Installation Recommendations – It is recommended that an isolation valve be installe
7 ALL THE PUMP YOU NEED AND MORE Revised 7-5-12 CR 32 & 45 – 1. Place the plastic adjustment fork under the cartridge seal collar (see Figure 7
8 ALL THE PUMP YOU NEED AND MORE Revised 7-5-12 Electrical Wiring Information NOTE: S1, SC & HC, H1 are factory provided jumper wires. Electrical
9 ALL THE PUMP YOU NEED AND MORE Revised 7-5-12 Drive Display/Operation No. Display Name Function 1 Data Display Area Displays the frequency ref